Our Experience

Educational

University of Florida – Thomas Hall (remodel)
Replace steam, condensate return, and hot water piping mains and risers

University of Florida – IFAS Building 475 (remodel)
Relocate three fume hoods with welded stainless steel exhaust duct. Install two Aaon fan coil units with chilled and heating hot water piping with associated duct work. Install Johnson controls system.

University of Florida – Jennings Hall (remodel)
Replace one Greenheck exhaust fan with exhaust duct and risers. Install five Envirotec fan coils with hot water reheat coils and piping with Automated Logic controls system

University of Florida – Newins/Zeigler Hall (reroof)
Relocate thirteen fume hood exhaust and supply fans with new roof stands, exhaust stacks, and roof curbs

University of Florida – Student Health Center (new construction)
Install one 85 ton Aaon roof top unit with water cooled condenser, forty-eight Envirotec VAV boxes, and associated duct. Install wireless Johnson Controls system and three Daikin mini split systems

Glen Springs Elementary (remodel)
Replace two 12.5 ton Lennox roof top units with associated ductwork

University of Florida – Norman Hall (remodel)
Replace all VAV boxes and associated duct work on ground floors

University fo Florida – Graham Hall (renovation)
Install one 100% outside air Mitsubishi system with associated ductwork and Automated Logic controls system

University of Florida – Maguire Village (renovation)
Install one 100% outside air Mitsubishi system with associated ductwork and Automated Logic controls system

University of Florida – Black Hall (remediation)
Remove all equipment and associated ductwork and controls from mechanical room, sanitize room and equipment and reinstall due to bat infestation.

University of Florida—Beatty Towers (remodel)
Replace twelve floors of duct systems with fire dampers and outlets

Kanapaha Middle School (replacement)
Replace three 250 ton McQuay chillers

Gainesville High School (replacement/addition)
Replace one 1 million BTU boiler and associated piping. Install one 30 ton Dessert Aire 100% O.A. RTU, one Trane 20 ton RTU w/Morganizer option, six vav boxes w/Johnson Controls DDC system, and associated duct work

Loften High School (new construction)
Install two 30 ton Dessert Aire 100% O.A. units, sixteen 5 ton Lennox split systems w/Humiditrol option, one 16 ft. kitchen hood w/make up system, and associated duct work

University of Florida—Yulee Hall (remodel)
Install one 10 ton Mitsubishi VRF system with six fan coils, and one 10 ton Addison 100% O.A. split system w/Automated Logic Controls. Replace two Cook 500 cfm utility set exhaust fans w/exhaust duct risers and outlets

Kappa Kappa Gamma Sorority (remodel)
Install seven 5 ton Trane split systems, one 15 ton Addison 100% O.A. split system, and duct work

Santa Fe High School (replacement)
Replace one 750,000 BTU boiler and associated piping

Oakview Middle School (replacement)
Replace two 1.5 million BTU boilers and associated piping

Mebane Middle School (repairs)
Repipe two 80 ton chillers and pumps

Government

VA Hospital Lake City, Fl – (remediation)
Duct cleaning and remediation for entire hospital (approx. 30,000 linear feet of duct work)

VA Hospital Lake City, FL (remodel)
Install one 40 ton Trane chiller, two Taco 5 h.p. chw pumps w/hydronic specialties, and one structural steel roof stand w/Siemens Controls system

VA Hospital Gainesville, FL (remodel)
Install one 40 ton Trane chiller w/pump package, one Trane Custom air handler w/steam and chw coils, one structural steel roof stand, two Trane steam reheat vav boxes w/Siemens Controls system, and stainless steel duct work
Replace one 25 ton Trane Custom air handler, and twenty eight Trane vav boxes w/Siemens Controls system

Gainesville Police Department Admin Facilities (remodel/new construction)
Install nine 5 ton Lennox split systems w/associated duct work, and Siemens Controls system
Install two 6 ton York split systems w/associated duct work

GRU Kelly Power Plant (remodel)
Install two 10 ton York RTUs, one 15 ton Aaon 100% O.A. RTU, and duct work

Multi-Family

The Palms (new construction)
Install forty four 2 ton Lennox split systems and associated duct work

Tioga Town Center Building #5 & #8 (new construction)
Install forty 4 ton Trane split systems and two 20 ton Aaon 100% O.A. RTUs and associated duct work

The Villages Phase IV Magnolia Building (new construction)
Install eighty 2 ton Trane split systems and associated duct work

Connemara Condominiums (new construction)
Install fifty 4 ton Goodman split systems and associated duct work

Retail

Walgreens—Gainesville Archer Rd. & 39th Ave. & 43rd St, Cheifland, Jonesville, Jacksonville, The Villages (new construction)
Install six 10 ton Carrier RTUs w/SIG Controls system and associated duct work

Dunkin Donuts—Ocala SR 40 & SR 200, Belleview, Inverness (new construction)
Install four 5 ton Carrier RTUs, one 5 ft. kitchen hood, and associated duct work

Lowe's Home Improvement Center–Orange Park (new construction)
Install twenty one 15 ton Lennox RTUs w/Novar Controls system and associated duct work

Staples Office Supply—Ocala (new construction)
Install six 7.5 ton Lennox RTUs and associated duct work

Office/Commercial/Restaurant

Williston Airport (new construction)
Install one 10 ton Carrier split system with associated duct work

Shands Vista @ Springhill (remodel)
Install three 5 ton Lennox RTUs, six 5 ton Lennox split systems, structural steel roof stands, and associated duct work

Gatorland Collision Center (remodel)
Install eight 15 ton Carrier split systems w/exposed double wall spiral duct systems

Oceans Restaurant (build out)
Install one 5 ton Trane split system, one 30 ton Aaon 100% O.A. RTU, one 20 ft. kitchen hood w/make up air system, and associated duct work

Invivo Manufacturing (remodel)
Install three 20 ton and two 15 ton Trane package units, five 80 foot runs of 26” exposed Duct Sox, w/associated duct work

Bank of America Building NW 13th St. (replacement)
Replace one 8 h.p. chilled water pump, add secondary 8 h.p. chilled water pump w/associated piping

St. Augustine Catholic Church (replacement)
Replace two 30 ton Trane split systems with associated duct work

Cox Cable (remodel)
Install eight 5 ton Lennox split systems with associated duct work

Sunshine Broadcasting Studios (new construction)
Install twelve 5 ton Lennox split systems, two ERVs, one 10 ton Addison 100% O.A. split system, and associated duct work

Heat Pipe Technologies Manufacturing (new construction)
Install five 5 ton Trane split systems, three 30” diameter fume exhaust stacks, and associated duct work

Micanopy Animal Hospital (new construction)
Install eight 4 ton Carrier split systems, one 15 ton Addison 100% O.A. split system, and associated duct work


Ductz